
Irving photo
The Canadian Coast Guard (CCG) has accepted CCGS Donjek, the first of two Arctic and Offshore Patrol Ships (AOPS) built for the Coast Guard by Irving Shipbuilding Inc. National Defence and the Coast Guard announced the delivery Nov. 27 in Halifax.
Irving says Coast Guard and Public Services and Procurement Canada (PSPC) officials signed the ship's documents at a ceremony at Halifax Shipyard.
Why it matters: The Donjek gives the Coast Guard an Arctic-capable patrol ship built on the same design as the Royal Canadian Navy's (RCN) six Harry DeWolf-class ships. The government says the ship will support Northwest Atlantic Fisheries Organization (NAFO) fisheries patrols, surveillance, search and rescue, environmental response and icebreaking on the East Coast and in the lower Arctic.
The ship: The government says the Coast Guard AOPS are adapted to the agency's needs, with changes to the bridge layout, accommodations and mission spaces.
The government lists the ships at 103 metres long and 19 metres wide, with a displacement of about 6,677 tonnes. Irving lists the Donjek at 104.7 metres.
Irving says the ship can accommodate a crew of 31, with berths for 57 in total.
It has a helicopter deck and hangar for the Coast Guard's light Bell 429 and medium-lift Bell 412 EPI helicopters, plus the Royal Canadian Air Force's Cyclone, according to the government.
Irving says it also has a 20-tonne crane for aids to navigation work, an A-frame for science missions, shipping container capacity for resupply and command and control spaces.
The government says the ships have an onboard medical facility and scientific capabilities to support science missions and humanitarian assistance.
Seasons: Irving says the Donjek can support icebreaking in the low Arctic in summer and on the East Coast in winter.
The name: The ship is named after the Donjek Glacier in Yukon's Kluane National Park. Irving says Donjek is a Southern Tutchone word meaning "white or silver berries."
The build: Ottawa announced in May 2019 that Irving would build two AOPS for the Coast Guard on top of the six for the RCN. The Coast Guard launched the Donjek in Halifax on April 29.
The government says lessons from the six RCN ships made the Coast Guard variant more efficient to build.
The AOPS are built under the large-vessel construction pillar of the National Shipbuilding Strategy (NSS).
The government estimates the AOPS contribute $459 million a year to Canada's economy and create or maintain 3,425 Canadian jobs a year over the 14-year period from 2015 to 2028.
Irving says its Halifax yard laid the keel in June for the future HMCS Fraser, the first of 15 River-class destroyers to be built in Halifax.
Fleet renewal: The Donjek is the fifth large vessel delivered to the Coast Guard under the NSS, joining one offshore oceanic science vessel and three offshore fishery science vessels, the government says.
The two AOPS will replace two of the Coast Guard's existing offshore patrol vessels.
The small-vessel side of the renewal has delivered 20 search and rescue lifeboats, seven hydrographic survey vessels, two channel survey and sounding vessels and one coastal research vessel.
The government's April launch release says the NSS also covers two polar icebreakers, up to six program icebreakers and up to 16 multi-purpose icebreakers for the Coast Guard.
What they said: "Protecting Canada's sovereignty means having the capabilities to operate in our waters, including in the Arctic. The delivery of CCGS Donjek is an important step forward," said Defence Minister David McGuinty.
"Through the National Shipbuilding Strategy, our government remains committed to maximizing economic benefits for Canada and supporting skilled jobs in our marine industry," said Joël Lightbound, minister of government transformation, public works and procurement.
"We are leveraging the knowledge and expertise of earlier Arctic and Offshore Patrol Ships construction to deliver the CCGS Donjek," said Stephen Fuhr, secretary of state for defence procurement.
"From the Atlantic to the Arctic, the vessel's modern capabilities will support key operations including fisheries enforcement, icebreaking and maritime security, while also strengthening our at-sea collaboration with the Royal Canadian Navy," said Kevin Brosseau, commissioner of the Canadian Coast Guard.
"From design to first steel to delivery, CCGS Donjek is a testament to the skill and professionalism of a Canadian workforce dedicated to building the best ships for Canada," said Dirk Lesko, president of Irving Shipbuilding.
What's next: Irving says the second Coast Guard AOPS, the future CCGS Sermilik, is scheduled for delivery in 2027.











